Centerline Utilities Projects

Centerline Projects

Deerfield Toyota

Deerfield Toyota for R.L Haines

Project Date: 2012

Project Description: Stormtech underground stormwater storage system at Deerfield Toyota for R.L. Haines.

Deerfield Toyota

36" and 24" Water Main Extension Project for Seacoast Utility Authority

Project Date: 2012

Project Description: Installation of approximately one mile of 36" and 24" Ductile Iron water main beginning at the SUA Hood Road WWTP to the intersection of Alt A1A and Gardens Parkway.

Old Dixie Highway & Hidden Valley Road in Boca Raton

Old Dixie Highway & Hidden Valley Road in Boca Raton

Project Date: 2012

Project Description: This project required the installation of a new drainage system to support the updated roadway design.

I-595 Corridor Improvements

I-595 Corridor Improvements

Project Date: 2012

Project Description:This project required the installation of a new drainage system to support the updated roadway design. Working adjacent to existing I-595 traffic during construction of a large drainage system, along the South side of SR 84 Eastbound, while dealing with contaminated soil conditions and sheet piling jack and bore connections to set large control structures were challenges the project staff managed through

Broken Sound Clubhouse Expansion for The Weitz Company

Broken Sound Clubhouse Expansion for The Weitz Company

Project Date: 2010 & 2011

Project Description: Renovation of an active Golf & Tennis Clubhouse facility which included the removal and replacement of drainage infrastructure and a parking lot as well as upgrading the water and sanitary sewer system to support the Clubhouse expansion. Parking was extremely valuable to the operating clubhouse. The removal of the existing parking lot and the installation of all drainage and utilities and placement of the new parking lot were accomplished in 6 weeks to minimize the disruption to the ongoing clubhouse operations.

Drainage Installation

SWCD W-55 & W-56

Project Date: 2012

Project Description: 84" diameter drainage RCP for the road crossing.

Atlantic Commons Plat One for GL Homes

Atlantic Commons Plat One for GL Homes

Project Date: 2012

Project Description: Water, Storm Drainage and Sewer Force main installation

 Harbour View Estates For Seaside Builders and the Town of Gulfstream

Harbour View Estates For Seaside Builders and the Town of Gulfstream

Project Date: 2012

Project Description: Complete Installation of Drainage and Water. The rock trencher was used to dig the pipe trench, through the solid coral rock.

Wellington Club Apartments for KAST Construction

Wellington Club Apartments for KAST Construction

Project Date: 2011 & 2012

Project Description: 42 acre site consisting of 7-13 story apartment buildings, a clubhouse and an onsite commercial parcel. 12" and 6" aerial crossings over the LWDD E-1 Canal and lock joint ductile iron directional drills under US 441 were used to connect utilities to the parcel from the West side of the site.

image

Wellington Municipal Complex for The Weitz Company

Project Date: 2010 & 2011

Project Description: The sitework portion of the Municipal Complex consisted of the demolition of the existing parking lot and drainage system and the construction of the new parking lot and utility infrastructure supporting the Village of Wellington's new headquarters

SR 845 Powerline Road

SR 845 Powerline Road for Ranger Construction

Project Date: 2010 & 2011

Project Description: SR 845 Powerline Road was a Design-Build project lead by Ranger Construction. The project consisted of new drainage installation designed to support the road's new configuration South of Glades Road in Boca Raton.